Zhangjiagang Stone Mechanical Equipment Co., Ltd. is a professional company located in Zhang JiaGang city, we have more than 20years experiences in plastic machinery and beverage filling machines Industry.
We devote ourselves to the products development, research, implode and make new products for plastic machine, liquid food, beverage packing and filling industry in China.
For plastic industry our main products include:
A. Hollow plastic products blow molding machine products volume from 0.5ml to 10000L
B. Plastic extrusion line
C. Injection machine
D. PET blow molding machine
E. Plastic product
QUOTATION
- PRODUCTION SYSTEM OF AUTOMATIC HIGH SPEED BLOW MOLDING MACHINE:
- Automatic high speed blow molding machine
MODE: Series of STBM452P
The blow molding machine mode STBM452P can produce bottle, kettle, can, bucket etc. The machine is especially designed for producing with material PE, PVC, PP and so on. The productive capacity can reach 850 mold/hr (idle cycle).
BASIC INSTALLATION INCLUDING
- Die head: Side-feed continuous die head
- Extrusion system: Adopt world-famous brand automatic temperature controlling device. Drive the screw with electromagnetism motor reducer to realize step less regulating.
- Clamping device: Two way synchronous clamping mechanism of crank arm to stabilize equipment well
- Blowing device: with top blowing type
Hydraulic system: The whole hydraulic system adopts world-famous brand controlling components and proportional controlling circle.
Electric controlling system: Adopt programmable controller made in Japan. Every electric component is of world-famous brand.
Unit price (including one series of spare parts)
FOB Shanghai (in USD )
STBM452P (double head, PE,PP etc. touch screen, for 0.25L) 24900USD
single die head for1L, 2L 2500USD
Packing 800USD
- MOLD
Price: Additionally discusses according to the size and shape. (We have a special mold-making factory)
No |
Name |
Cavity |
Qty |
Material |
Structure |
Unit price (USD) |
Total price (USD) |
1 |
250ml |
2 |
1 |
Cavity is P20, base is 45steel |
Bottom deflashes |
4200 |
4200 |
2 |
1L |
1 |
1 |
Cavity is P20, base is 45steel |
Bottom deflashes |
2700 |
2700 |
3 |
2L |
1 |
1 |
Cavity is P20, base is 45steel |
Bottom deflashes |
3200 |
3200 |
Total |
|
|
|
|
|
|
10100 |
-
- ADDITIONAL SUBSERVIENCE EQUIPMENT ( BY OPTION )
NO. |
Name |
Spec |
Qty |
Unit price (USD |
Packing |
1 |
Autoloader |
200kg |
1 |
800 |
Free |
|
2 |
Crusher |
7.5HP |
1 |
1800 |
80 |
|
3 |
Chiller |
7HP |
1 |
3,508 |
69 |
|
4 |
Air Compressor |
10hp 8kg |
1 |
1,500 |
80 |
|
5 |
Conveyor belt (bottle) |
1 |
1600 |
80 |
|
6 |
Top neck cutter |
|
1 |
4500 |
55 |
|
|
|
|
|
|
|
|
|
Please note : Compressed air is needed except the above device.
Air supply: 0.7-0.8Mpa
Runoff: 0.4m3/min
- DEFINITION OF OUR PRICE:
The range of this quotation list doesn't include the following items:
1). Cost for wiring, tubing and the material not included in the machine
2). Material, lubricating oil and hydraulic oil for test run
3). Transportation cost and insurance
- TERMS OF PAYMENT:
30% should be paid at order placement.
70% should be paid one-off after the customer affirmed.
- DELIVERY TIME:
At___50__ days after receipt your 30% pre-payment and confirmation by both sides of all technical and commercial details in the contract.
Advance payment being reserved.
- TRAINNING:
The supplier should train two or three operating men for free(but the cost for trainee's board and lodgin
- INSTALLATION AND START-UP IN THE BUYER'S PLANT:
The buyer should place the machine to the right position and inform the supplier after the machine reach the buyer's factory. The seller will send the engineer to test run the machine until it is running in normal state. The buyer will bear his round-trip air tickets, accommodation, and hotel and so on in BUYER'S side. And the buyer will pay USD150/day/person as technician labor cost when he leaves factory until leave client's plant.
- GUARANTEE FOR QUALITY:
Our guarantee is valid for a period of 12 months.
If the malfunction caused of the machine's self quality, we will troubleshoot it for free. But when we change the parts attainted which should be changed to new ones,the buyer should support with all strength
- VALIDITY OF OUR OFFER:
Our offer is valid for any order placed within a period of 30 days. Unless otherwise stated all quotations and techinical data are based on this list
Our offer is offered for the buyer's need in selecting and not act as the enclosure of contract. The contract is the only standard.
The particular technical data is shown in the enclosure. If there is some further need please get in touch with us immediately.
Best wishes,
peterfang
----------------------------------------
9.INCLOSURE: TECHNICAL DATA AND PARTS INSTRUCTIONS OF BLOW MOLDING MACHINE FOR SERIES OF STBM452P TECHNICAL PARAMETER
|
Item |
Value |
Unit |
General information |
Max. product volume |
2 |
L |
Productivity(unload circulation) |
850 |
PC/h |
Screw Dia. |
φ45 |
mm |
Screw Length/Dia. Ratio |
24 |
L/D |
Extruder system |
Plasticising capacity(HDPE) |
30 |
Kg/h |
Driving power(Frequency Conversion) |
11 |
Kw |
Heating Capacity |
6 |
Kw |
Lifting stroke of extruder surface |
200 |
mm |
Mold clamping system |
Clamping force |
24 |
KN |
Mold Platen |
250x320 |
mm |
Max. mold(W×H) |
250X275 |
mm |
Mold thickness |
80-160 |
mm |
Distance of mold platen |
80-330 |
mm |
Stroke of mold platen |
250 |
mm |
Single die head |
Max. Die dia. |
φ70 |
mm |
Heating Power |
2.5 |
Kw |
Heating zone |
2 |
|
Double die heads |
Max. Die dia. |
φ40 |
mm |
Heating Power |
3.7 |
Kw |
Heating zone |
2 |
|
Center distance |
130 |
mm |
Four die head |
Max. Die dia. |
φ20 |
L |
Heating Power |
3.5 |
Kg |
Heating zone |
2 |
mm |
Center distance |
60 |
Kw |
Consumption |
General assembly power |
27 |
Kw |
Average energy consumption |
15 |
Kw |
Air supply pressure |
0.7 |
Mpa |
Working pressure |
0.6 |
Mpa |
Air consumption |
0.3 |
m3/min |
Cooling water consumption |
0.3 |
m3/h |
Power |
AC ,50HZ |
380V+_10% |
|
Machine parameters |
Machine Size(L×W×H) |
2.6×1.7×2.2 |
m |
Machine Weight |
2.8 |
T |
Electric system |
Touch screen |
HITCH color |
PLC |
Panasonic |
Transducer |
FUJI or Scheider TE |
Contactor |
TE |
Air switch |
MERLIN GERIN |
Air switch |
MERLIN Gerin |
Relay |
OMRON |
Motor |
Beide siemens |
Heater |
Extruder heater is Ceramic |
Hydraulic system |
Valve |
Yuken and Taiwan brand |
Pump |
Fuxin |
Sealing |
FOX |
Pressure controller. |
Proportion valves |
Lubricate system |
Auto lubrication |
Pneumatic system |
Air valve |
Airtac |
Cylinder |
Airtac |
Mechanism |
Gearbox |
Hardware |
Screw |
Special design 38CrMoAIA |
Clamping |
Hydraulic direct action die locking, two-way synchronous mechanism |
10. COMPONENTS STBM452P
11, LIST OF PARTS ATTACHED TO STBM654P MACHINE
No. |
Name |
Spec. |
Qty. |
Remark |
1 |
Blowing needle waterway seal ring |
Φ17×1.8 |
10pc |
|
2 |
Air pipe |
Φ10 |
20m |
|
3 |
Triangle belt |
Length is same to the belt on the machine |
5pc |
|
4 |
Inner hexagon spanner |
S=3-14mm |
1set |
|
5 |
Air switch |
DPN10A |
1pc |
|
6 |
Air switch |
DPN20A |
1pc |
|
7 |
Solid relay |
50A |
1pc |
|
8 |
Relay |
LY2 DC24V |
1pc |
|
9 |
Mushroom-shaped button switch |
1A1B red |
1pc |
|
10 |
Fuse base |
FS-012/2P |
1pc |
|
11 |
Fuse |
Φ6×30 3A |
6pc |
|
12 |
Fuse |
Φ5×20 8A |
2pc |
|
13 |
Thermocouple |
WRNX-21 2.5M |
1pc |
|
14 |
High temperature conducting wire |
AF300ºC 2.5mm2 |
5m |
|
15 |
Die head heater |
|
1set |
|
16 |
Cast-aluminum heater |
|
1pc |
|
12.MACHINE STRUCTURE.
13. BLOW MOLDING MACHINE OF STBM452P pictures